News
Repairs continue on Willow Loop
Work continues on low water crossings along with the Willow City Loop. The schedule (weather permitting) is as follows: • The Legion Creek crossing at 12110 Willow City Loop will be repaired June 3-10. • The Coal Creek (Hardin/Mulder) crossing at 5357 Willow City Loop will be repaired June 11-17. •