News
Willow City Loop road work planned
Work is expected to begin next week on low water crossings along with the Willow City Loop. Different sections of the Willow City Loop will be closed to thru traffic for a week at a time while the low water crossing work is done. The proposed schedule (weather permitting) is as follows: • The Legion